We appreciate your understanding and look forward to seeing everyone at the next Coffee with the Mayor in September!

FLOOD WATCH | BE WEATHER AWARE
The National Weather Service has issued a Flood Watch for the Globe-Miami area from 4:00 PM Wednesday, August 12, through 6:00 AM Thursday, August 13.
Abundant moisture and thunderstorms may produce heavy rainfall, creating the potential for flooding in creeks, washes, low-lying areas and other flood-prone locations.
🌧️ Please take time now to prepare:
• Stay weather aware and have multiple ways to receive emergency alerts.
• Avoid creeks, washes and low-water crossings during heavy rainfall.
• Never drive through flooded roadways. Turn Around, Don’t Drown.
• Secure outdoor items and prepare your property before storms arrive.
• If you live or work in a flood-prone area, be prepared to move to higher ground if conditions worsen.
• Do not enter closed or barricaded roads or areas.
A Flood Watch means conditions are favorable for flooding. It does not mean flooding is currently occurring. A flood watch means you should be prepared to act quickly if a Flash Flood Warning is issued.
Please continue to monitor local weather conditions and official updates throughout the evening.
Stay weather aware. Flood Watch = Be Prepared






At Hagen Road for Infrastructure Upgrades
GLOBE, AZ – Please be advised that the Upper Community Center (Skate Park) located
at Hagen Road will experience a temporary facility closure to accommodate essential
sidewalk installation and paving improvements.
Closure Details:
- Dates: Wednesday, August 12, 2026 through Friday, August 21, 2026.
- Affected areas: The entire Upper Community Center facility, including all
surrounding walkways and parking areas.
- Sporting Facilities: There will be no public access to any onsite sporting facilities,
fields, or recreational courts during this active construction window.
This project is part of ongoing efforts to improve pedestrian safety within the community.
Visitors and residents are asked to utilize alternative local park facilities during this time
and avoid entering the designated construction zones for safety. Normal operations and
full public access to the sporting facilities are scheduled to resume on Friday, August 21,
2026 at 5:00p.m. We appreciate the public’s patience and cooperation as these
necessary upgrades are completed.
For questions or further information, please contact Stephen Smith at 928-200-9297.
Please Note: Doege and their subcontractors are authorized contractors for the City of Globe
performing sidewalk repair within the City of Globe. All inquiries, questions, request or
complaints regarding any City subcontractors should be directed to the city.


Sign up here: https://bit.ly/4unCTRg

GLOBE, AZ - Please be advised that infrastructure improvements will begin on August 11th to August 19th, 2026, at Cedar Street, between Broad Street and Pine Street. The project is being completed by Scholz Contracting.
A significant increase in construction vehicles, heavy equipment, and traffic delays are expected in the immediate area. Travelers and motorists are strongly encouraged to avoid this area and utilize alternative routes to prevent delays.
This work is necessary to complete vital infrastructure improvements. Commuters who must travel through the zone are urged to use extra caution, reduce speeds, and watch for flaggers and construction personnel.
For questions or further information, please contact Stephen Smith at 928-200-9297.
Please Note: Scholz Contracting and their subcontractors are authorized contractor for the City of Globe performing sidewalk repair within the City of Globe. All inquiries, questions, request or complaints regarding any City subcontractors should be directed to the city.

There’s more visible progress this week as improvements continue around Jesse Hayes and the Community Center area.
This week, crews:
🔹 Poured new curb along the park entry road
🔹 Poured a portion of the new sidewalk
🔹 Poured a new picnic table slab next to the basketball court
🔹 Continued preparing the subgrade for new curb and sidewalk along Hagen Road
Piece by piece, these improvements are taking shape and will provide better pedestrian access and upgraded amenities throughout this busy recreation area.
Thank you for your patience and caution around construction crews as work continues!
#CityOfGlobe #JesseHayesProject #CommunityImprovements #GlobeAZ






Another week of progress is underway on the Jesse Hayes Improvement Project!
Crews have been focused on: ⚡ Installing underground electrical conduit along Hagen Road for planned roadway lighting. 🚶 Preparing the subgrade for the new curb, gutter, and sidewalk along the skate park entry road.
These improvements are important steps that help lay the foundation for the next phase of construction. While some of the work may not be immediately visible once complete, it is essential to creating safer, more accessible infrastructure for everyone who uses this area.
Thank you for your continued patience as these improvements move forward. Every step brings us closer to a finished project that will better serve our community.
#CityOfGlobe #BuildingGlobe #Infrastructure #CommunityProgress



If you haven't enrolled yet, now is the time!
Through the City of Globe agreement, Globe residents can receive 68% off the standard nationwide household PHI Cares membership rate.
This membership provides nationwide coverage for medically necessary air transport by PHI Air Medical or a cooperative partner, helping protect your household from out-of-pocket transportation costs while traveling outside our local service area.
📅 Enrollment closes August 12, 2026.
Have questions? Stop by and meet Carrie Brookshire with PHI Cares:
📍 Copper Cities Coffee
🗓 Saturday, August 8
⏰ 9:00 a.m. to 1:00 p.m.
Use code GLOBEUPGRADE to receive the City of Globe discount.
See the flyer below for complete details.

Who: Eligible Gila County homeowners impacted by the September 2025 flooding
What: USDA Rural Development Home Repair Assistance applications
When: Thursday, August 6, 2026, 11:00 a.m.–2:00 p.m. and 3:00 p.m.–6:00 p.m.
Where: Gila County Central Heights Complex (Health Department Conference Room), 5515 S. Apache Ave., Globe
Eligible homeowners may apply for financial assistance for essential home repairs. Applicants must own and occupy their home, meet income eligibility requirements, and bring the required documentation.
See flyer below for more information.







At Tuesday's Special City Council Meeting, Council approved the Guaranteed Maximum Price (GMP) for the laying of Riprap as part of the Pinal Creek Bank Stabilization Efforts. Tiffany Construction will begin this work as early as today.
At the July 14th meeting Council approved holding a Special Meeting on July 21st at noon in order to allow Tiffany to immediately transfer from sediment removal to bank stabilization. The City is facing a September 11th NRCS deadline to complete the work in the creek. This Special Meeting helped to keep the project within the deadline.
Council also approved ingress/egress and permanent public drainage easements for properties where ongoing bank stabilization is needed. Staff will begin reaching out to affected property owners for this, today.
Community Questions:
Does an ingress/egress or permanent public drainage easements mean the City owns my property?
No.
An easement does not transfer ownership. The property remains privately owned. The easement simply allows the City to access and maintain the drainage improvements in the future.

Essential City services, including Police, Fire, and Public Works, remain operational and continue to be on call to respond to storm-related conditions.
Please continue to avoid flooded roadways, follow posted signs and directions from emergency personnel, and never drive through flowing water.